E. 8TH AVE WATER MAIN REPLACEMENT: PEARL ST TO WILLAMETTE ST

Bids due: August 18, 2022 @ 2:00 pm

INVITATION TO BID

ITB 22-141-PW


The Eugene Water & Electric Board (EWEB) requests bids for the construction and installation of approximately 740 feet of 16-inch ductile iron pipe water main along E. 8th Avenue from the E.8th Ave/Pearl St intersection to the E.8th Ave/Willamette St intersection including but not limited to water valves, fittings, connected water services and fire hydrants.

Bidders shall meet Minimum Contractor and Specialty Subcontractor Qualifications as defined in the bid packages. In summary, these Minimum Qualifications include:

• Contractor:

a. The General Contractor shall have successfully managed/completed, during the past five (5) years, at least three (3) water pipeline or related projects that included the installation of ductile iron pipe in paved streets.

b. The proposed construction superintendent shall be currently employed by the qualified General Contractor and shall have been the construction superintendent on no less than two (2) water pipeline projects during the last five (5) years which included the installation of ductile iron pipe in paved streets. The qualified construction superintendent will be required to be on the project site in responsible charge, full-time, during all construction activities.

Bidders shall comply with all BOLI and CCB requirements, as outlined in www.oregon.gov/BOLI and http://www.oregon.gov/ccb/Pages/index.aspx.

The bid package may be inspected online on the State of Oregon's bid site ("Oregon Buys"):

https://oregonbuys.gov/bso/. (For navigation help, contact the Purchasing Analyst.)

Bid Submission Deadline: Sealed bids shall be submitted to Wendy Lopez, Purchasing Analyst, before 2:00 PM Pacific Standard Time, on Thursday, August 18, 2022 and delivered according to the bid submission instructions contained in the bid solicitation document. Bids will be opened immediately thereafter and recorded.

First-tier subcontractor list (Section 00430) shall be submitted, preferably in a separate envelope by 4:00 PM PST, on Thursday, August 18, 2022.

Bids and required subcontractor’s list received after their respective deadlines will NOT be considered. No faxed bids will be accepted.

A pre-bid meeting will not be held.

By submission of a bid, the bidder agrees to comply with the provisions of 279C.800 through 279C.870 relating to the latest version of State of Oregon’s BOLI Prevailing Wage Rates.

Single point of contact: Submit all technical, bidding, website access, and contract questions to Wendy Lopez, Purchasing Analyst, in writing via email at Wendy.Lopez@eweb.org. DO NOT contact the project team without prior approval by the Purchasing Analyst.

BY: Wendy Lopez, EWEB Purchasing Analyst

ISSUED: July 28, 2022

PUBLISHED: July 29, 2022.