City of Tualatin - 2022 neighborhood traffic safety projects phase 1 10/04/22



CITY OF TUALATIN

2022 NEIGHBORHOOD TRAFFIC SAFETY PROJECTS PHASE 1

Bids due: October 4, 2022 @ 3:00 pm

INVITATION TO BID


The City of Tualatin is accepting sealed proposals (“Bids”) for the 2022 neighborhood traffic safety projects phase 1 until 3:00 pm, October 4, 2022, (“Bid Closing”) at City of Tualatin Services Center, 10699 SW Herman Road, Tualatin Oregon 97062. Brooke Baxter is the person designated to receive bids. Bids will not be received after such date and time. Please contact Brooke Baxter at bbaxter@tualatin.gov or 503-691-3044 with any questions about submitting bids.

Bids will be publicly opened and read aloud ("Bid Opening") immediately following the bid closing deadline.

The First-Tier Subcontractor Disclosure form will be received at the location given for the receipt of the bid until 5:00 pm (local time), October 4, 2022. Instructions for providing the First-Tier Subcontractor Disclosure and the required disclosure form are included in the Contract Documents. The disclosure form shall be submitted no later than two working hours, including lunch hours, after the Bid Closing. THE CITY WILL REJECT A BID IF THE BIDDER FAILS TO SUBMIT THE DISCLOSURE FORM WITH THIS INFORMATION BY THE STATED DEADLINE.

IDENTIFICATION OF PROJECT: Major items of work consist of the following: curb and sidewalk improvements, curb ramp replacement, replacement of roadway asphalt, striping and signing, pedestrian RRFB signal, modifications to existing pedestrian push buttons, landscaping, and other items as called for on the plans.

Contract Documents, including plans and specifications, may be obtained and examined at the City’s bid website https://bids.tualatinoregon.gov/ by creating an account and joining the plan holders list.

CONTRACT TIME: The Contractor shall begin construction Work within 30 calendar days following the Notice to Proceed. Contractor shall reach substantial completion of all work except for asphalt concrete paving and striping by April 15, 2023. Contractor shall reach substantial completion of all asphalt paving no later than May 15, 2023. Contractor shall reach substantial completion of striping no later than May 30, 2023. The contractor shall reach final completion of the project (including all punch list items) no later than June 15, 2023.

Other bid requirements and plan holders list available at https://bids.tualatinoregon.gov.

Dated this 9th day of September, 2022.

CITY OF TUALATIN (County of Washington, State of Oregon)

Published September 13, 2022.